Inspection that catches defects before they leave the dock.
From pre-production audits through final random inspection, our QC engineers protect every container with photo, video, and AQL documentation.
Four checkpoints between your PO and a sealed container.
Each stage is run by a qualified QC engineer with photo, video and signed AQL documentation in your inbox within 24 hours.
Request a Quote- 01Factory audit
Full plant review of legal status, capacity, equipment and quality management before the first PO is placed.
- 02Pre-production check
Raw materials, components and tooling verified against your spec before the line starts running.
- 03During-production (DUPRO)
Mid-run inspection while there's still time to correct defects — not after they're packed.
- 04Final & loading
AQL 2.5 random sampling, functional testing and witnessed container loading before shipment is authorized.
Quality protection across every step of production.
Full plant audit covering legal status, capacity, quality systems, working conditions and references.
Verification of raw materials, components and tooling before production starts.
Catching defects mid-production when there's still time to correct course.
AQL 2.5 standard sampling and full functional testing before shipment is authorized.
Witnessed loading to prevent quantity, packaging or damage disputes.
Photo, video and PDF reports delivered to your inbox within 24 hours of inspection.
Evidence-grade reports — not just a pass / fail email.
Every inspection produces structured documentation you can defend in a dispute, file with your insurer, or share with your buyer.
100+ HD photos covering workmanship, packaging, labels and defects with annotations.
Walk-through video of production lines, loading and any critical defects we surface.
Engineer-signed inspection report with AQL tables, measurements and pass / hold recommendation.